x
Breaking News
More () »

TxDOT: Maintenance and traffic lane closures scheduled for early January

SAN ANTONIO -- Weather permitting the following closures will occur in Bexar County in January
Check the traffic before your commute on Kens5.com

ID=19283127SAN ANTONIO -- Weather permitting the following closures will occur in Bexar County:

Wednesday – Friday, December 31 – January 16

24 hour closure

U.S. 90 at Brady Blvd.

Crews with SAWS will close the westbound entrance ramp of U.S. 90 at Brady Blvd. for mill, overlay and concrete work.

Saturday, January 3

2 a.m. to 2 p.m.

U.S. 281 from Nakoma Drive to Bitters Road

Crews will have a complete closure of north and southbound U.S. 281 from Nakoma Drive to Bitters Road to pour bridge deck on the U.S. 281 overpass.

Northbound Detour: Traffic will exit to Bitters Road and reenter U.S. 281 at the Bitters entrance ramp.

Southbound Detour: Traffic will exit to Bitters Road; stay on frontage road and go through the Bitters and Nakoma intersections and reenter at Nakoma.

Sunday – Friday, January 4 – 9

9 p.m. to 5 a.m.

Interstate 410 Frontage Road from Fredericksburg Road to Farm to Market Road 2536 (Old Pearsall Road)

Crews will close alternating frontage road lanes of Interstate 410 from Fredericksburg Road to Farm to Market Road 2536 (Old Pearsall Road) for crack seal work.

9 p.m. to 5 a.m.

Interstate 35 Frontage Road from U.S. 90 to Somerset Road

Crews will close alternating frontage road lanes of Interstate 35 from U.S. 90 to Somerset Road for crack seal work.

9 p.m. to 5 a.m.

U.S. 281/Interstate 410 Frontage Road from Airport Blvd. to Chulie Drive

Crews will close alternating frontage road lanes of southbound U.S. 281/Interstate 410 from Airport Blvd. to Chulie Drive for crack seal work.

9 p.m. to 5 a.m.

Interstate 410 Frontage Road from U.S. 281 to Interstate 10

Crews will close alternating frontage road lanes of Interstate 410 from U.S. 281 to Interstate 10 for crack seal work.

9 p.m. to 5 a.m.

Interstate 410 Frontage Road from Wetmore Road to Broadway Street

Crews will close alternating frontage road lanes of Interstate 410 from Wetmore Road to Broadway Street for crack seal work.

9 p.m. to 5 a.m.

Interstate 410 Frontage Road from Interstate 10 to Wetmore Road

Crews will close alternating frontage road lanes of Interstate 410 from Interstate 10 to Wetmore Road for crack seal work.

Monday, January 5

9 a.m. to 4 p.m.

Loop 368 from Juliette to Kennedy Ave.

Crews will close the right lane of southbound Loop 368 from Juliette to Kennedy Ave. for pulling fiber.

Monday – Friday, January 5 – 16

9 .m. to 4 p.m.

Farm to Market Road 2536 (Old Pearsall Road) from S.W. Military Drive to Five Palms Drive

Crews with CPS Energy will close the right lane of westbound Farm to Market Road 2536 (Old Pearsall Road) from S.W. Military Drive to Five Palms Drive for installing poles.

Monday – Friday, January 5 – 9

9 a.m. to 3 p.m.

Farm to Market Road 1957 (Potranco Road) from Clover Creek to S. Ellison Drive

Crews will close the right lane of eastbound Farm to Market Road 1957 (Potranco Road) from Clover Creek to S. Ellison Drive to construct a sidewalk.

Monday – Friday, January 5 – 16

9 a.m. to 3 p.m.

Loop 1604 from State Highway 16 (Bandera Road) to Interstate 10

Crews will close the right lane and shoulder of Loop 1604 from State Highway 16 (Bandera Road) to Interstate 10 for storm drain cleaning.

9 a.m. to 3 p.m.

Interstate 10 from Camp Bullis to Loop 1604 Frontage Roads

Crews will close various lanes of Interstate 10 from Camp Bullis to Loop 1604 frontage roads for storm drain cleaning.

Tuesday – Wednesday, January 6 – 7

9 a.m. to 5 p.m.

Loop 1604 from U.S. 281 to Farm to Market1535 (N.W. Military Hwy)

Crews will close the right shoulder of westbound Loop 1604 from U.S. 281 to Farm to Market1535 (N.W. Military Hwy) to remove the variable speed limit portable sign trailers.

Tuesday, January 6

9 a.m. to 4 p.m.

Loop 368 from Cunningham Ave. to Post Ave.

Crews will close the right lane of northbound Loop 368 from Cunningham Ave. to Post Ave. for pulling fiber.

Wednesday, January 7

9 a.m. to 12 noon

U.S. 281 from Basse Road to Sunset Blvd.

Crews will close the right lane and exit ramp of northbound U.S. 281 from Basse Road to Sunset Blvd. for sign work. DETOUR: Take next exit then turnaround.

Before You Leave, Check This Out